Do you need planning permission for an extension?
Many single storey extensions in England can be built without a planning application under permitted development, but the limits are specific and some homes do not have these rights at all. This guide sets out the extension planning permission rules as the Planning Portal and GOV.UK publish them, along with the fees, building regulations and party wall notices that apply.
Planning permission or permitted development
Permitted development rights allow householders in England to make certain changes to a house without applying for planning permission, provided the work meets every limit and condition. If your extension goes beyond any one of them, you need a householder planning application instead. The rules below are the Planning Portal's summary for extensions, which covers England only, and GOV.UK's householder technical guidance gives the same depth, height and land coverage limits.
Permitted development is not a loophole or a guarantee, and your local planning authority has the final say on whether a scheme qualifies. Always check your proposal with your council before you commit to drawings or a builder. Some general conditions apply to every extension, whatever its type.
- Only half the area of land around the original house can be covered by extensions or other buildings.
- An extension must not be higher than the highest part of the existing roof, or higher at the eaves than the existing eaves.
- Within two metres of a boundary, the eaves cannot exceed three metres in height.
- Materials must be of similar appearance to the existing house.
The limits are measured against the "original house", so ask your council how any earlier extensions to your home affect what is left. GOV.UK's technical guidance was last updated in September 2019, so check the current position with your council. If your house has been extended before, gather any old plans or approvals before you design anything new.
Single storey rear extensions
The most common extension, a single storey rear extension, has its own depth and height limits under permitted development. The depth is measured from the rear wall of the original house, not from any later addition. The table sets out the Planning Portal's limits.
| Extension | Limit | Source |
|---|---|---|
| Single storey rear, detached house | No more than four metres beyond the rear wall of the original house | Planning Portal |
| Single storey rear, any other house | No more than three metres beyond the rear wall of the original house | Planning Portal |
| Single storey rear, height | No more than four metres | Planning Portal |
| Larger single storey rear, with prior approval | Up to eight metres for a detached house, or six metres for any other house | Planning Portal |
| Side extension | Single storey only, no more than four metres high, and no wider than half the width of the original house | Planning Portal |
| More than one storey, rear | No more than three metres beyond the rear wall of the original house, and not within seven metres of any boundary opposite the rear wall | Planning Portal |
| More than one storey, roof and windows | Roof pitch to match the existing house as far as practicable, and upper floor side windows obscure glazed | Planning Portal |
| Side extension of more than one storey | Always needs householder planning permission | Planning Portal |
If your plans fit these limits, our single storey extension cost guide sets out published prices by size and finish. If they do not, a planning application does not mean the extension is out of reach, only that the council must consider it. Councils weigh each application on its merits, so nobody can promise in advance that permission will be granted.
Larger rear extensions and prior approval
The larger home extension scheme lets you go deeper than the standard limits with a single storey rear extension, up to eight metres for a detached house or six metres for any other house. It is not available on Article 2(3) designated land or a Site of Special Scientific Interest, according to the Planning Portal. Instead of a full planning application, you make a prior approval application to your local planning authority.
GOV.UK's technical guidance says householders have to notify the local planning authority, and that works cannot commence until the authority notifies the householder that no prior approval is required, or until 42 days have passed without any decision. GOV.UK gives the fee for a prior approval application for a larger rear extension as £249 from 1 April 2026. If you start before either of those points, you risk building without the approval the scheme requires.
Side and two storey extensions
Side extensions are more tightly controlled than rear ones. Under permitted development a side extension must be single storey, no more than four metres high, and no wider than half the width of the original house, and the Planning Portal is clear that all side extensions of more than one storey need householder planning permission. On Article 2(3) designated land, every side extension needs householder planning permission.
A two storey rear extension can be permitted development, but only within the stricter limits for extensions of more than one storey. It must not extend more than three metres beyond the rear wall of the original house or come within seven metres of any boundary opposite the rear wall, its roof pitch should match the existing house as far as practicable, and upper floor side windows must be obscure glazed. If your design goes beyond any of these limits you will need a householder application, and our two storey extension cost guide covers what they typically cost.
When permitted development does not apply
The Planning Portal says the extension rules apply to houses only, and not to flats and maisonettes, converted houses or houses created under certain permitted development rights, other buildings, or areas where there may be a planning condition, Article 4 Direction or other restriction. GOV.UK's guidance confirms that a council can remove permitted development rights through an Article 4 Direction. If any of these applies to your home, you are likely to need a planning application for work that would otherwise be permitted.
On Article 2(3) designated land, which covers conservation areas, Areas of Outstanding Natural Beauty, National Parks, the Broads and World Heritage Sites, all side extensions and all rear extensions of more than one storey need householder planning permission, and exterior cladding is not allowed. Listed buildings need listed building consent for any alteration or extension that would affect their character, and the Planning Portal warns that carrying out such work without consent beforehand is a criminal offence. Parts of Sussex lie in conservation areas and protected landscapes, so check with your local council what applies to your property rather than assuming.
Planning application and lawful development certificate fees
If you need planning permission, the householder application fee in England is £548 for a single house from 1 April 2026, according to GOV.UK. The Planning Portal says fees rose by 3.8% on that date, so older figures quoted on some websites are out of date. A lawful development certificate for a proposed use costs half the normal planning fee, and it gives you formal confirmation that your extension is lawful without needing full permission.
The Planning Portal says having a lawful development certificate is not compulsory, and a decision is due within 8 weeks. It also stresses that a successful certificate is not a replacement for planning permission where permission is required. Applying before you build gives you the position in writing rather than relying on your own reading of the rules.
| Application | Fee | Source |
|---|---|---|
| Householder application, single house | £548 | GOV.UK |
| Householder application, two or more houses | £1,083 | GOV.UK |
| Prior approval, larger rear extension | £249 | GOV.UK |
| Lawful development certificate, proposed use | Half the normal planning fee | GOV.UK and Planning Portal |
| Lawful development certificate, existing use | Same as the full application fee | GOV.UK |
| Listed building consent | No application fee | Planning Portal |
| Planning Portal online service charge | £0, £99 or £149 including VAT, depending on band | Planning Portal |
Building regulations and party wall rules are separate
Planning permission and building regulations are two different things, and an extension built under permitted development still needs to meet building regulations. GOV.UK says the regulations cover the construction and extension of buildings, and that you can use your council's building control service or a private registered building control approver. A full plans application gets a decision within 5 weeks, or 2 months with your consent, a building notice lets smaller projects start two days after submission, and GOV.UK warns that the person doing the work could be prosecuted and fined if it does not comply.
The Party Wall etc. Act 1996 is also separate from planning and building regulations, and approval under either does not remove the need to follow it. GOV.UK's explanatory booklet says notice must be given at least one month before building a new wall on the boundary line, at least two months before work to an existing party wall, and at least one month before excavating near a neighbour's foundations. A notice is only valid for a year, and if a neighbour does not respond to a notice for party wall work or excavation, a dispute is deemed to have arisen.
| Source | Work | Plan charge | Inspection charge | Building notice | Regularisation |
|---|---|---|---|---|---|
| Adur and Worthing Councils (from 1 April 2026, includes VAT except regularisation) | Extension up to 15m² | £252.30 | £588.69 | £1,009.19 | £1,051.23 |
| Adur and Worthing Councils (from 1 April 2026, includes VAT except regularisation) | Extension 15m² to 60m² | £326.46 | £761.74 | £1,305.84 | £1,360.25 |
| Arun District Council (from 1 April 2026, before VAT except regularisation) | Extension up to 15m² | £266.75 | £640.20 | £1,088.34 | £1,360.43 |
| Arun District Council (from 1 April 2026, before VAT except regularisation) | Extension up to 60m² | £346.78 | £853.60 | £1,440.45 | £1,800.56 |
| Mid Sussex District Council (charges from April 2025, before VAT except regularisation) | Extension up to 15m² | £192 | £505 | £697 | £1,045.50 |
| Mid Sussex District Council (charges from April 2025, before VAT except regularisation) | Extension over 15m² up to 60m² | £266 | £650 | £916 | £1,374 |
Building control charges vary by council, so check your own council's building control page, or ask a private registered building control approver, which sets its own fee. When you are ready to price the work, Sussex Builder can put you in touch with up to 3 checked local builders for free, no obligation quotes through our extensions page or on 01273 115520. Builders and designers can help you understand which route your project needs, but the decision on planning always rests with your council.
Frequently asked questions
How far can I extend without planning permission?+
Under permitted development, a single storey rear extension can extend up to four metres beyond the rear wall of the original house for a detached house, or three metres for any other house, according to the Planning Portal. Through the prior approval scheme this rises to eight and six metres respectively. Other conditions apply, so check with your local planning authority.
How much is a planning application for an extension?+
GOV.UK gives the householder application fee in England as £548 for a single house from 1 April 2026. A prior approval application for a larger rear extension costs £249. The Planning Portal may also add a service charge for online applications.
Do two storey extensions need planning permission?+
A two storey rear extension can be permitted development if it extends no more than three metres beyond the original rear wall and is at least seven metres from the boundary opposite. All side extensions of more than one storey need householder planning permission, as do rear extensions of more than one storey on Article 2(3) land such as conservation areas.
Do I need building regulations approval if I do not need planning permission?+
Yes, they are separate. GOV.UK says building regulations cover the construction and extension of buildings, so an extension built under permitted development still needs to comply. You can use your council's building control service or a private registered building control approver.
Can permitted development rights be removed?+
Yes. GOV.UK says a council can remove them through an Article 4 Direction, and the Planning Portal says the rights do not apply where there is a planning condition or other restriction. They also do not apply to flats and maisonettes.
Sources for the prices on this page
Prices are published UK averages and include labour. Every job is different, so the quotes you receive will reflect your own property, access and materials.
- Planning Portal: Planning permission, extensions, checked 25 October 2026
- GOV.UK: Permitted development rights for householders, technical guidance (updated 10 September 2019), checked 25 October 2026
- GOV.UK: Fees for planning applications in England from 1 April 2026, checked 25 October 2026
- Planning Portal: What it costs, checked 25 October 2026
- Planning Portal: Lawful development certificate, checked 25 October 2026
- Planning Portal: Listed buildings, checked 25 October 2026
- GOV.UK: Building regulations approval, when you need approval, checked 25 October 2026
- GOV.UK: Building regulations approval, how to apply, checked 25 October 2026
- GOV.UK: The Party Wall etc Act 1996, explanatory booklet, checked 25 October 2026
- GOV.UK: Preventing and resolving disputes in relation to party walls, checked 25 October 2026
- Adur and Worthing Councils: Guidance on building regulation charges (from 1 April 2026), checked 25 October 2026
- Arun District Council: Building control fees and charges (from 1 April 2026), checked 25 October 2026
- Mid Sussex District Council: Building control charges from April 2025, checked 25 October 2026
- Planning Portal: English planning application fees increase on 1st April 2026, checked 25 October 2026